La Neuve Route Road Repairs
La Neuve Route Road Repairs
- 21st March -1st April. (no weekends)
- 08.30 a.m. – 6.00pm (same working hours as Mont les Vaux resurfacing)
The works being carried out are between the car garage and La Haule Court.
Due to the ongoing works on Le Mont Les Vaux and there being currently significantly reduced volumes of traffic using La Neuve Route, the above road repairs will be carried out. The works will be controlled using traffic lights and lane closures.
Roadside parking on the beach side, between the Sacred Heart of Jesus Catholic Church and La Haule slipway will be restricted for the first week of the works (21st – 25th March).
Parking on both sides of the road between the Sacred Heart of Jesus Catholic Church and Citicabs taxi office will be restricted for the second week of the works (28th Mar – 1st April).
Please contact Ryan Gregory – Highway Maintenance Engineer Tel Mobile +44 (0)7797856862